Food and beverage
Lovo Molini Pivetti

Case study: Molini Pivetti

REQUIREMENT

The need of the company was dictated by the desire to comply with the requirements of the regulations in force for fire protection, to protect the company itself and all personnel from any risks. The customer has decided to upgrade all the group’s production plants to the current safety norms. 

IDROELETTRICA’S PROPOSAL

After carrying out inspections and accurate checks, Idroelettrica proposed and then delivered the appropriate fire-fighting systems to the four production plants. 
Take, for example, the head office in RENAZZO: Prefabricated module for outdoor use contains a suction lift pressurisation unit with semi-axial pumps with vertical axis VTP (Vertical Turbine Pumps).

THE RESULT

The solution proposed by Idroelettrica represented the best compromise between price and performance for the 72 m3/h customer flow rate  Prevalence  80 m.c.a. of the system also from the point of view of after-sales assistance. The customer has found in Idroelettrica the ideal partner able to guarantee the service that also includes the service of assistance and routine maintenance of the systems. 

Carta di identità

Idendity card Molini Pivetti

Download PDF

IT
EN